How to stay on budget with construction jobs on the farm

3.5 read time

Farm construction projects are more likely to stay on budget when producers plan the work in detail, include at least a 10% contingency, hire an experienced general contractor or project manager and review the schedule and costs every week.

Key takeaways

  • Include at least a 10% contingency budget
  • Do thorough project planning
  • Consider hiring a professional general contractor or project manager
  • Review the schedule and budget with your contractor every week

Krista Hulshof, owner of Veld Architect, has helped Canadian farm owners renovate and build new structures for 14 years. She says when planning a project, she likes to start working with the farmer as soon as possible to outline the details of the project. Taking the time to plan is critical, she says, because that’s where the most important elements are usually discovered: the flaws.

“This actually allows you to build in contingency and ensure that what you are building is within the constraints you want it to be,” Hulshof says.

She says it’s a must to build in an overflow budget of at least 10 per cent. It’s a normal part of any project and farmers should still be aware of it.

Detailed plans can improve pricing accuracy

With planning, be as specific as possible. If you don’t include clear directions and ideas of what you want to see, builders may make assumptions and fill in the blanks for you.

“Your version of normal is not someone else’s version of normal, so be as detailed as possible,” she says. “The more details, the less assumptions; that ultimately means more accurate pricing.”

Greg Hutchings, a manager at UFA Farm and Ranch Structures, subscribes to this belief as well, and encourages producers to do the heavy lifting of a pen before building materials.

Plans should be viewed as guidelines to keep cost overruns in check.

“A lot of contractors can put a dollar value on a piece of paper. What is truly important is to educate yourself on what you need, so you're better able to successfully plan the project,” he says. “Planning may cost you funds up front, but the process allows you to potentially save costs in the future.”

He cites having drawings completed before you go to quote stage to reduce inaccuracies of competitive quoting. Plans should be viewed as guidelines to keep cost overruns in check.

A project manager can co-ordinate the build

Because there can be so many moving parts on a given project, producers should consider hiring a general contractor, or project manager. This is often a skilled tradesperson who also can manage the build and co-ordinate all details.

“For significant building projects it would be wise to hire a professional general contractor who will sit down with you to design the project, with your involvement in the process,” says Gary Van Bolderen, of the Canadian Construction Foundation and founder of Dutch Masters Construction Services in Barrie, Ont.

General contractors have the knowledge of what makes a project run smoothly and bring that experience to your build. Ask for examples of projects that have been completed to get a sense of how they operate. They know the most up-to-date building codes, necessary approvals and many small, but important details, others may overlook.

Hulshof echoes this sentiment and highlights trust as a building component that’s as important as a lumber or concrete.

“You have to have that trust with your contractor,” she says. “If you don’t, you will probably not find value in what they are doing and will always question them.”

Review the schedule and budget every week

No project goes perfectly according to plan, but certain projects are better managed than others, specifically when airtight contracts, clear communications and regular check-ins are the expected standard.

Hulshof says weekly meetings with your contractor should be a baseline expectation where the current and predicted end date are updated as well as the current and expected final costs.

“If there are going to be changes, it gives you time to negotiate them,” she says. “It’s also important to have all the contractors involved communicating and working together as much as possible. Otherwise, there can be mix-ups which might add to the cost.”

Many details are technical in nature, but many are also important to the overall scope of the project. The big picture pieces are just as important as the hands-on physical labour aspect of a build or renovation.

“You should be regularly discussing schedule and budget for an overall successful project,” says Hulshof. “Evaluate the end date and end budget in every meeting.”

Download our Construction Checklist to help make your project a success.

Article by Trevor Bacque

Trevor is the president of Bacque 40 Communications, an agricultural marketing and communications studio based in Western Canada.